Document library
Selected later records and the existing searchable archive for 1001 Virginia Avenue. Reviewed November 8, 2026.
Selected records · October and November productions
Reviewed originals and narrow page excerpts, with original page numbers preserved in each listing. Summaries are labeled editorial, not presented as original records. Production dates and document dates are different; scheduled inspections are not results.
We do not publish raw email/privilege bundles, nutrient-credit financial PDFs, personal billing details, or text hidden by redactions. View the fixed publication allowlist.
10 of 10 selected records
November 8 permit and inspection snapshot
CIVL Active; completed inspection tally and November 12 scheduled appointment; BDRA Ready to Issue and outstanding invoice. Not live data.
Source: Jeffrey Werby’s verified November 8, 2026 snapshot supplied for this update
Five-request FOIA status review
Agency response status and remaining production gaps, with a privacy-safe invoice breakdown rather than the original billing page.
Source: Received-records audit November 5, Parts 4–5; November 8 requester update; INV26-F022803-1
July 7 → July 8 engineering review comparison
Opening approval language, removed owner flooding-acknowledgment requirement and changed variance language.
Source: L07-021142-SP_Solara_at_Shadowlawn_6th_Review-EG__4_.docx and ...6th_Review-EG.docx
Civil inspections: CSV produced November 5
Production snapshot with completed results through October 20; not the November 8 current tally.
Source: 2026-CIVL-26157_updated_insp.csv
Civil inspections: CSV produced October 23
Preconstruction, October 13 flooding/rain-event result and October 16 excavator-fire inspection note.
Source: 2026-CIVL-26157_insp.csv
DEQ replacement no-permit-required letter
JPA 26-0055 / NAO-2026-00081; selects NWP basis A.6 on page 3 and preserves reporting and other-approval conditions.
Source: 26-0055_20261020_DEQ NPR Letter.pdf
Solara at Shadowlawn site-plan approval
Plan approval, construction-release conditions, variance language and wetland-jurisdiction disclaimer.
Source: 20260724-PLN-L07-021142-SP_1001_Virginia_Ave_Approval-LTR.pdf
Corps verification, selected plans and NWP 18 criterion
Verification letter; existing conditions, proposed development and cross-section sheets 2–4; NWP 18 opening page. The 25 CY criterion is not a project fill-volume measurement.
Source: 2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_Verification_Letter_ACOE.pdf
City Wetlands Board no-permit-required letter
Local jurisdiction determination, with express caveat that other agency approvals may be required.
Source: 2026-WTRA-00009_Shadowlawn_Associates_LLC_1001_Virginia_Ave_NPR.pdf
February 11 JPA revision: context and impact plans
Public permitting email context and two selected plan sheets showing the +3.22-foot avoidance note and +3.1-foot / 20-square-foot cross-section label.
Source: JPA_Revision_2_2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_REV_02.pdf
Existing document archive
55 admin-published archive documents. The separate metadata and full-text tools below search this archive, not the curated selection above. Existing document notes and detail pages are unchanged.
Showing 55 of 55 archive documents