Record reviewed through . Not a live permit feed.

The Record

What the public records show about the approval and construction at 1001 Virginia Avenue. Compare the record with a rule or the City’s own written requirement, then read the gap and the source. Each issue opens a four-part account with its limits intact.

Status meanings and full-inventory counts
Documented contradiction (15)
Two records, or a record and a stated requirement, do not align. This is not a legal finding.
Named in request but not produced (11)
The item was requested by name or plain wording and has not appeared in the productions held. It may exist elsewhere.
Agency said no records (1)
The agency expressly said the particular requested record does not exist. This does not describe every record on the topic.
Reported, not proven (1)
An individual report without a confirming agency record. Timing and causation may be unverified.
Incomplete / still investigating (7)
The available facts are partial. A pending record, field question or unverified requirement could change the assessment.

Issue matrix

35 of 35 issues shown

Open an issue for its record, requirement, gap and citations. Scroll the table sideways on small screens.

1001 Virginia Avenue issue inventory — status describes the record, not a legal conclusion.
IssueTopic / jurisdictionStatusMismatch or open questionSource
W1 No confirmed agency field verification of the wetland line appears in the records heldWetlandsCity · Virginia · FederalDocumented contradictionThese are different limits on agency review, not four categorical statements that no one visited. No independent agency field verification is confirmed in the records held. The Corps FOIA may establish whether it visited. No verified rule requiring a site visit has been identified.City FOIA reply (saved agency email)2026-10-21 · UnpaginatedAll citations for W1
W2 The plan says all wetlands below +3.22 ft are avoided, but its own cross-section shows an impact at +3.1 ftWetlandsCity · VirginiaDocumented contradictionThe applicant’s +3.1 ft label is below its +3.22 ft line, so the two plan statements do not align. The no-permit letter does not explain that impact. Whether the strip has the vegetation and elevations needed for local jurisdiction is a field question; this comparison does not establish a permit violation.JPA_Revision_2_2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_REV_02.pdf2026-02-11 · p. 2 (January 29 request), pp. 6–7 (Sheets 3–4)All citations for W2
W3 The approved outfall places riprap in labeled wetlands off site; no substantive City evaluation was producedWetlandsCity · FederalNamed in request but not producedF022866 item 8 requested City review of the +3.22 line, wetland types and outfall. The only identified response is the location comment, not an evaluation of wetland jurisdiction. The February 20 letter does not discuss the outfall.2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_Verification_Letter_ACOE.pdf2026-04-13 · pp. 1, 8All citations for W3
W4 The City said its Cape Henry tide worksheet does not existWetlandsCity · VirginiaAgency said no recordsThe consultant supplied the adopted elevation, but no City worksheet checking its inputs was produced. The source review notes that choosing Rudee Inlet instead may not move the line much; it did not establish a different NAVD88 contour. This issue concerns the missing documented check, not proof that +3.22 ft is wrong.JPA_Revision_2_2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_REV_02.pdf2026-02-11 · p. 1All citations for W4
W5 DEQ replaced a waiver based on an assumed local permit on October 20, 2026WetlandsVirginia · FederalDocumented contradictionThe earlier letter rested on a permit assumption DEQ later acknowledged. The practical legal effect is unresolved: the general §401 certification may have covered the project throughout. The replacement is not evidence by itself that earlier work was unauthorized.DEQ waiver letter2026-01-14 · Page unavailable; box A.4All citations for W5
W6 The application’s waters table and impact inventory classify the same wetlands differentlyWetlandsVirginia · FederalDocumented contradictionThe waters table identifies E2 wetlands as tidal while Appendix C labels all impacts non-tidal. The narrative’s “isolated” pond description also sits alongside a report of repeated saltwater overtopping. These are document inconsistencies; they do not independently determine jurisdiction or eligibility for a permit.JPA__First_Submittal_1001_Virginia_Avenue_Condominiums.pdf2026-01-12 · Page unavailable; waters table and Appendix CAll citations for W6
W7 The approved plan proposes filling 3,737 sq ft of pond; no fill volume is recordedWetlandsFederal · CityIncomplete / still investigatingNo produced document quantifies the proposed pond fill in cubic yards or assigns each impact to NWP 7 versus NWP 18. It is therefore unresolved whether the NWP 18 volume condition applies to this pond and, if so, how it is met. Approved/proposed fill is not proof of the volume actually placed. The Corps FOIA remains open.2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_Verification_Letter_ACOE.pdf2026-04-13 · pp. 1, 10, 96All citations for W7
W8 Staff’s internal draft said the project “involves filling wetlands”; the public answer replaced that sentenceWetlandsCityDocumented contradictionThe public answer omitted the draft’s wetland-fill description. Manning answered in writing on 3/3/2026 that “the ditch and the pond are not jurisdictional to the Wetlands Board” and that “the revision avoids impacts to wetlands associated with that drainage feature below 3.22 feet.” That conclusion conflicts with Sheet 4’s +3.1 ft impact label, and no produced record reconciles the two. An editorial change alone does not establish improper intent or a legal violation.RE__Proposed_development_at_1001_Virginia_Ave__DSC_File_L07-021142-SP_.pdf2026-03-03 · Embedded email pp. 3–4; March 2 draftAll citations for W8
W9 A 2024 City answer said the site was not tidal wetlands; an older adjacent-parcel file describes a tidal ditchWetlandsCityDocumented contradictionThe 2024 answer predates the delineation. The neighboring parcel’s 1984 record and the 2026 review raise a question about that broad answer. Treating the 1984 ditch as the same shared drainage feature is an inference from legal descriptions, not a new field finding.RE__1001_Virginia_-_23_condos__Floodplain_wetlands.pdf2024-10-09 · Embedded email p. 1All citations for W9
W10 The approval letter does not address the Corps’ conditional local-approval caveatWetlandsCity · Federal · VirginiaIncomplete / still investigatingThe City had issued a no-Board-permit letter. Whether an additional local permit was required remains the field/jurisdiction question in W2. If none was required, the Corps caveat creates no additional issue. The requested workflow records have not resolved what DSC relied on.2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_Verification_Letter_ACOE.pdf2026-04-13 · p. 2All citations for W10
W11 No Wetlands Board hearing or notice record is held; the need for one depends on jurisdictionWetlandsVirginia · CityIncomplete / still investigatingThe hearing provisions attach to a qualifying Board application. The absence of a hearing is not a separate established failure unless the underlying jurisdiction and permit question is resolved.2026-WTRA-00009_Shadowlawn_Associates_LLC_1001_Virginia_Ave_NPR.pdf2026-02-20 · p. 1All citations for W11
N1 The plan was approved without the neighbor’s written permission the City had required for 14 monthsNeighbor’s landCityDocumented contradictionThe produced approval and indemnity do not show the written permission the City’s reviews required. The indemnity protects the City, not the adjacent owner. Whether that substitute was legally permissible is not resolved here.20250519-PLN-L07-021142-SP-Review1-LTR.docx2025-05-19 · Page unavailable; adjacent-parcel permission commentAll citations for N1
N2 The City’s review offered an indemnity alternative to adjacent-owner permissionNeighbor’s landCityDocumented contradictionThe written reviews moved from a permission requirement to an indemnity alternative. No produced record shows the adjacent owner agreed to that substitute. This comparison does not decide property rights or the validity of the agreement.20260306-PLN-L07-021142-SP_1001_Virginia_Ave_Review4-LTR.docx2026-03-06 · Page unavailable; adjacent-parcel commentAll citations for N2
N3 Contact proof reached the City after approval; the file shows two emails, not certified mailNeighbor’s landCityDocumented contradictionThe produced contact proof arrived after approval. No certified-mail proof, direct owner letter or record of the proposed August 19 call was identified. This is a limit of the held record, not proof that no other contact ever occurred.FO22866_R.pdf2026-08-06 · p. 161All citations for N3
N4 7/7/2026 “cannot be approved” became “approved” on 7/8, with the owner flooding acknowledgment demand deletedNeighbor’s landCity · VirginiaDocumented contradictionNo updated owner acknowledgment, 10-year ponding exhibit or City acceptance record was produced under F022866 item 4. The deleted comment supports a process comparison, not a conclusion that flood protection was legally inadequate.L07-021142-SP_Solara_at_Shadowlawn_6th_Review-EG__4_.docx2026-07-07 · Page unavailable; flood acknowledgment commentAll citations for N4
N5 The developer’s letters to the neighbor cited a drainage easement the City’s own lawyer called rescindedNeighbor’s landCityIncomplete / still investigatingThe underlying deed and court order themselves are not held. The new September 2026 project-parcel easements do not resolve rights on the neighboring parcel. No determination of present property rights is made here.FO22866_R.pdfExact date unavailable · pp. 16, 18All citations for N5
N6 No City notice to neighbors was produced for the site plan, variances or wetlands fileNeighbor’s landCityNamed in request but not producedNo City notice record, and no statement that none was required.received-records-audit.md2026-11-05 · Unpaginated, §5.1 item 3All citations for N6
S1 Bigger pipe, more water toward the ditches: the developer’s lawyer said no added burden; the City Attorney said otherwiseStormwater & floodingCityDocumented contradictionThe two released letters describe the off-site drainage burden differently. The engineering and property-rights questions are not settled by either letter. No new flood or causation finding is made here.Holleran-Taylor_7-31-2025.PDF2025-07-31 · Page unavailable in this copy; also Release.pdf pp. 17–19All citations for S1
S2 The flood-analysis variance changed from unsupported to acceptable; no separate findings were producedStormwater & floodingVirginia · CityNamed in request but not producedThe City’s stated position changed in about seven weeks. The approval records do not set out findings addressing the exception criteria, and no stand-alone exception record was produced. The model figures are reported for comparison, not as an independent engineering finding or a legal conclusion.20260520-PLN-L07-021142-SP_1001_Virginia_Ave_Review5-LTR.docx2026-05-20 · Page unavailable; combined flood-analysis commentAll citations for S2
S3 The project must show no increased flooding through the City’s drainage study; no City model files were producedStormwater & floodingCityNamed in request but not producedNo City model inputs, outputs, run logs, maps or reconciliation memo were produced. The produced emails and developer model do not document a separate City run. Non-production does not establish that the files never existed or that the project will increase flooding.RE__Proposed_development_at_1001_Virginia_Ave__DSC_File_L07-021142-SP_.pdf2026-03-03 · Embedded email p. 5 (Logan, February 27, 2026)All citations for S3
S4 Agreement and easement milestones followed approval; submission and recording are different conditionsStormwater & floodingCityDocumented contradictionEasement recordation came after the stated pre-approval deadline. The maintenance agreement was not final at approval, but the City’s pre-approval requirement was submission, not recordation: the records summarized here do not establish its initial submission date. Its separate recording-before-release condition was met. Later recording must not be described as failure to record.20250519-PLN-L07-021142-SP-Review1-LTR.docx2025-05-19 · Page unavailable; agreement and easement commentsAll citations for S4
S5 The approved design removes pond storage; no tidal or compensatory-storage analysis was producedStormwater & floodingCity · VirginiaNamed in request but not producedThe produced storm manual provides rainfall modeling, but no identified tidal-boundary, compensatory-storage or no-rise analysis. The City did not say that none exist. This does not establish the amount of storage actually removed or an engineering finding about future flooding.20250519-PLN-L07-021142-SP-Review1-LTR.docx2025-05-19 · Page unavailable; pond-storage commentAll citations for S5
A1 Variance decisions appear in approval comments; separate findings and the orifice disposition remain missingApprovals & variancesCity · VirginiaNamed in request but not producedA separate variance decision was requested in F022803 (#3: “the City’s decisions, conditions, approvals, denials”) and F022866 (#6) but not produced. Some variance decisions are already documented in the approval letter; they must not be described as wholly unrecorded. The 4.5-inch orifice disposition remains unclear.20260724-PLN-L07-021142-SP_1001_Virginia_Ave_Approval-LTR.pdf2026-07-24 · p. 2, Advisory B–DAll citations for A1
A2 No approval-history (workflow) printout was produced; a prior site-plan upload was deleted at the engineer’s requestApprovals & variancesCityNamed in request but not producedThe missing workflow makes upload and status-change dates, and retention of the deleted upload, unclear. The approval copy is held. No records-retention standard was verified, so the deletion is not presented as a proven retention violation.FO22866_R.pdf2026-06-11 · pp. 257–258All citations for A2
A3 The 1986 rezoning conditions were only partly recorded; the plan shows a different bufferApprovals & variancesCityDocumented contradictionThe recorded proffer does not reproduce all the listed Council conditions. Whether the plan’s buffer satisfies the zoning conditions is unresolved. The 10-foot Category IV label comes from the requester’s earlier plan review, not a City determination.waterfield_ltr_A1.pdfExact date unavailable · p. 2All citations for A3
A4 Retaining-wall permit status is Ready to Issue, with fees outstanding as of November 8Approvals & variancesCityIncomplete / still investigatingThis is a dated permit status, not evidence of a violation or proof that the wall was built without a permit. Requested permit records remain behind the F022803 deposit.snapshot-2026-11-08.md2026-11-08 · Unpaginated; 2026-BDRA-28536All citations for A4
F1 A rain-event erosion inspection failed on 10/13/2026; no violation notice or follow-up reinspection was producedField & inspectionsCityNamed in request but not producedNo corrective action or reinspection specifically tied to that failed rain-event item was produced. Later passed inspections are held. A failed inspection alone is not a notice of violation or a finding that work was unlawful.2026-CIVL-26157_insp.csv2026-10-13 · Unpaginated; rain-event rowAll citations for F1
F2 The fire report confirms foam use; type, quantity and cleanup records were not producedField & inspectionsCity · VirginiaNamed in request but not producedNo foam type, quantity, cleanup record, spill notice or contractor SWPPP foam log was produced under F022866 items 12–13. The held notes say foam was contained on site; they do not establish an unlawful discharge. Applicability of a spill-reporting duty to this foam is unverified.202601023-FIR-FPB-F022866-1001_VIRGINIA_AVE_R.pdf2026-10-16 · p. 6All citations for F2
F3 Possible construction-vibration damage at a neighboring home (reported, not proven)Field & inspectionsCityReported, not provenThe timing, whether the damage is new, and its cause are unconfirmed. The owner’s report is not proof that the construction caused the damage.Jeffrey Werby owner report2026-10-29 · Unpaginated; no confirming agency recordAll citations for F3
R1 The same email material was withheld in some copies and readable in anotherRecords & FOIAVirginia · CityDocumented contradictionDifferent released copies treat the same material differently. This does not decide whether any exemption was proper, whether privilege was waived, or whether FOIA was violated.redaction-inconsistency-report.mdExact date unavailable · Unpaginated; table rows 1–10All citations for R1
R2 Fully black pages with no readable copy anywhere, and no list of what was withheldRecords & FOIAVirginia · CityIncomplete / still investigatingThe withheld contents are unknown. No under-redaction content is reproduced or inferred. This inventory does not decide whether withholding was proper or whether an additional description was legally required.Redacted_-_highlighted_for_review_R.pdf2026-11-05 · pp. 16–18, 30–35, 43–46, 85–88, 100–111 (29 fully black pages)All citations for R2
R3 Unrelated Corps records were included in this project’s City wetlands fileRecords & FOIACity · FederalDocumented contradictionNo correction or reconciliation record was produced. A number mix-up is a plausible explanation, not a confirmed cause, and no effect on an approval has been established.2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_2026-0055_PASDOLetter_RS_ACOE.pdf2026-01-16 · p. 1All citations for R3
R4 The largest City request is on hold behind a $481.65 deposit, which includes $130 for a file already deliveredRecords & FOIACityNamed in request but not producedRequested records remain unsearched or unproduced while the request is on hold. The same Hickory file is identified in the free production and the storage-retrieval charge. This comparison does not determine whether the charge was legally permissible.Invoice_INV26-F022803-1.pdf2026-10-23 · p. 1All citations for R4
R5 The Corps FOIA is open; nothing has been produced yetRecords & FOIAFederalIncomplete / still investigatingThe decision memorandum, delineation review, any site-visit record, coordination and fill-volume basis are outstanding. The approximately November 10 response marker is a tracker estimate, not a live deadline determination.Corps FOIA tracking correspondence2026-10-19 · UnpaginatedAll citations for R5
R6 DEQ’s file lacks a listed attachment and anything after 1/28/2026Records & FOIAVirginiaNamed in request but not producedThe original FOIA production contains no post-January 28 records. The separately received October material does not supply the missing Additional Data Needs attachment, and the October 16 follow-up was not addressed. This issue does not claim that no later DEQ record is held at all.RRS app rcvd .msg2026-01-12 · Unpaginated; attachment listAll citations for R6

Sources, method and limits

This is a neighborhood advocacy site’s inventory of received public records, not an independent engineering review, agency determination or legal advice. “Documented contradiction” describes records that do not align; it does not mean a court or agency found a violation. A missing record is not proof that it never existed.

The inventory uses the October 21 City F022755 review, the November 5 received-records audit, the November 8 case inventory and dated permit snapshots. PDF page references use the original file’s page index; portfolio email pages are labeled separately. Excerpts retain visible original page references. Source notes distinguish official text checked by the earlier review, staff-cited requirements, OCR and unverified questions. This update did not independently recheck every statute, page image or live agency system.

Where a document date or page could not be grounded, the citation says unavailable or unpaginated rather than guessing. A linked document may be a safe excerpt or source summary; other citations lead to the curated recent records library, not a promise that the entire original file is public here. Original filenames remain visible.

Bank information, redacted personal details, unrelated-project personal details, unsent drafts and privileged email bodies are not republished. Nothing beneath a redaction is reconstructed. Conclusions about wetland jurisdiction, engineering adequacy, property rights and damage causation remain unresolved where the record says so.