The Record

What the public records show about the approval and construction at 1001 Virginia Avenue. Compare the record with a rule or the City’s own written requirement, then read the gap and the source. Each issue opens a four-part account with its limits intact.

Status meanings and full-inventory counts
Documented contradiction (15)
Two records, or a record and a stated requirement, do not align. This is not a legal finding.
Named in request but not produced (11)
The item was requested by name or plain wording and has not appeared in the productions held. It may exist elsewhere.
Agency said no records (1)
The agency expressly said the particular requested record does not exist. This does not describe every record on the topic.
Reported, not proven (1)
An individual report without a confirming agency record. Timing and causation may be unverified.
Incomplete / still investigating (7)
The available facts are partial. A pending record, field question or unverified requirement could change the assessment.

Issue matrix

11 of 35 issues shown

Open an issue for its record, requirement, gap and citations. Scroll the table sideways on small screens.

1001 Virginia Avenue issue inventory — status describes the record, not a legal conclusion.
IssueTopic / jurisdictionStatusMismatch or open questionSource
W1 No confirmed agency field verification of the wetland line appears in the records heldWetlandsCity · Virginia · FederalDocumented contradictionThese are different limits on agency review, not four categorical statements that no one visited. No independent agency field verification is confirmed in the records held. The Corps FOIA may establish whether it visited. No verified rule requiring a site visit has been identified.City FOIA reply (saved agency email)2026-10-21 · UnpaginatedAll citations for W1
W2 The plan says all wetlands below +3.22 ft are avoided, but its own cross-section shows an impact at +3.1 ftWetlandsCity · VirginiaDocumented contradictionThe applicant’s +3.1 ft label is below its +3.22 ft line, so the two plan statements do not align. The no-permit letter does not explain that impact. Whether the strip has the vegetation and elevations needed for local jurisdiction is a field question; this comparison does not establish a permit violation.JPA_Revision_2_2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_REV_02.pdf2026-02-11 · p. 2 (January 29 request), pp. 6–7 (Sheets 3–4)All citations for W2
W3 The approved outfall places riprap in labeled wetlands off site; no substantive City evaluation was producedWetlandsCity · FederalNamed in request but not producedF022866 item 8 requested City review of the +3.22 line, wetland types and outfall. The only identified response is the location comment, not an evaluation of wetland jurisdiction. The February 20 letter does not discuss the outfall.2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_Verification_Letter_ACOE.pdf2026-04-13 · pp. 1, 8All citations for W3
W4 The City said its Cape Henry tide worksheet does not existWetlandsCity · VirginiaAgency said no recordsThe consultant supplied the adopted elevation, but no City worksheet checking its inputs was produced. The source review notes that choosing Rudee Inlet instead may not move the line much; it did not establish a different NAVD88 contour. This issue concerns the missing documented check, not proof that +3.22 ft is wrong.JPA_Revision_2_2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_REV_02.pdf2026-02-11 · p. 1All citations for W4
W5 DEQ replaced a waiver based on an assumed local permit on October 20, 2026WetlandsVirginia · FederalDocumented contradictionThe earlier letter rested on a permit assumption DEQ later acknowledged. The practical legal effect is unresolved: the general §401 certification may have covered the project throughout. The replacement is not evidence by itself that earlier work was unauthorized.DEQ waiver letter2026-01-14 · Page unavailable; box A.4All citations for W5
W6 The application’s waters table and impact inventory classify the same wetlands differentlyWetlandsVirginia · FederalDocumented contradictionThe waters table identifies E2 wetlands as tidal while Appendix C labels all impacts non-tidal. The narrative’s “isolated” pond description also sits alongside a report of repeated saltwater overtopping. These are document inconsistencies; they do not independently determine jurisdiction or eligibility for a permit.JPA__First_Submittal_1001_Virginia_Avenue_Condominiums.pdf2026-01-12 · Page unavailable; waters table and Appendix CAll citations for W6
W7 The approved plan proposes filling 3,737 sq ft of pond; no fill volume is recordedWetlandsFederal · CityIncomplete / still investigatingNo produced document quantifies the proposed pond fill in cubic yards or assigns each impact to NWP 7 versus NWP 18. It is therefore unresolved whether the NWP 18 volume condition applies to this pond and, if so, how it is met. Approved/proposed fill is not proof of the volume actually placed. The Corps FOIA remains open.2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_Verification_Letter_ACOE.pdf2026-04-13 · pp. 1, 10, 96All citations for W7
W8 Staff’s internal draft said the project “involves filling wetlands”; the public answer replaced that sentenceWetlandsCityDocumented contradictionThe public answer omitted the draft’s wetland-fill description. Manning answered in writing on 3/3/2026 that “the ditch and the pond are not jurisdictional to the Wetlands Board” and that “the revision avoids impacts to wetlands associated with that drainage feature below 3.22 feet.” That conclusion conflicts with Sheet 4’s +3.1 ft impact label, and no produced record reconciles the two. An editorial change alone does not establish improper intent or a legal violation.RE__Proposed_development_at_1001_Virginia_Ave__DSC_File_L07-021142-SP_.pdf2026-03-03 · Embedded email pp. 3–4; March 2 draftAll citations for W8
W9 A 2024 City answer said the site was not tidal wetlands; an older adjacent-parcel file describes a tidal ditchWetlandsCityDocumented contradictionThe 2024 answer predates the delineation. The neighboring parcel’s 1984 record and the 2026 review raise a question about that broad answer. Treating the 1984 ditch as the same shared drainage feature is an inference from legal descriptions, not a new field finding.RE__1001_Virginia_-_23_condos__Floodplain_wetlands.pdf2024-10-09 · Embedded email p. 1All citations for W9
W10 The approval letter does not address the Corps’ conditional local-approval caveatWetlandsCity · Federal · VirginiaIncomplete / still investigatingThe City had issued a no-Board-permit letter. Whether an additional local permit was required remains the field/jurisdiction question in W2. If none was required, the Corps caveat creates no additional issue. The requested workflow records have not resolved what DSC relied on.2026-WTRA-00009_-_1001_Virginia_Avenue_Condominiums_-_Verification_Letter_ACOE.pdf2026-04-13 · p. 2All citations for W10
W11 No Wetlands Board hearing or notice record is held; the need for one depends on jurisdictionWetlandsVirginia · CityIncomplete / still investigatingThe hearing provisions attach to a qualifying Board application. The absence of a hearing is not a separate established failure unless the underlying jurisdiction and permit question is resolved.2026-WTRA-00009_Shadowlawn_Associates_LLC_1001_Virginia_Ave_NPR.pdf2026-02-20 · p. 1All citations for W11

Sources, method and limits

This is a neighborhood advocacy site’s inventory of received public records, not an independent engineering review, agency determination or legal advice. “Documented contradiction” describes records that do not align; it does not mean a court or agency found a violation. A missing record is not proof that it never existed.

The inventory uses the October 21 City F022755 review, the November 5 received-records audit, the November 8 case inventory and dated permit snapshots. PDF page references use the original file’s page index; portfolio email pages are labeled separately. Excerpts retain visible original page references. Source notes distinguish official text checked by the earlier review, staff-cited requirements, OCR and unverified questions. This update did not independently recheck every statute, page image or live agency system.

Where a document date or page could not be grounded, the citation says unavailable or unpaginated rather than guessing. A linked document may be a safe excerpt or source summary; other citations lead to the curated recent records library, not a promise that the entire original file is public here. Original filenames remain visible.

Bank information, redacted personal details, unrelated-project personal details, unsent drafts and privileged email bodies are not republished. Nothing beneath a redaction is reconstructed. Conclusions about wetland jurisdiction, engineering adequacy, property rights and damage causation remain unresolved where the record says so.