Document intelligence

Search the Record

Full-text search across 1,488 indexed passages from 55 FOIA documents. Find what the developer claimed, what the city reviewed, and where the stories diverge.

20 results for "stormwater" (from 299 total matches)

9.5%
stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following
SitePlan 2ndSubmittal
Site Plan · Page 1
9.5%
stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following
SitePlan
Site Plan · Page 1
9.5%
stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following
F020901 Emails R
Correspondence · Page 1
9.4%
stormwater pipe (29310-028/030) tie into new stormwater pipe system. 6. New stormwater pipes
SitePlan 2ndSubmittal
Site Plan · Page 1
9.3%
stormwater management facilities during land disturbance. Conversion to a permanent stormwater management facility should only
9.3%
stormwater management facilities during land disturbance. Conversion to a permanent stormwater management facility should only
SitePlan
Site Plan · Page 1
9.3%
stormwater management facilities during land disturbance. Conversion to a permanent stormwater management facility should only
F020901 Emails R
Correspondence · Page 1
9.1%
stormwater system installed as part of this project. [City Code, App. D Erosion and Stormwater